- Home
- Spacecraft
- STEP Cube Lab II
STEP Cube Lab II
South Korean CubeSat. STEP Cube Lab II was launched on June 21, 2022 aboard a Nuri from Naro. Latest status in GCAT: in orbit.
COSPAR 2022-065DNORAD 52897South Korea
Identity
- Name in GCAT
- STEP Cube Lab II
- Payload designation
- STEPCubeLab-2
- International designator
- 2022-065D
- NORAD catalog number
- 52897
- GCAT identifier
- S52897
- UN registration
- ST/SG/SER.E/1078
Mission
- Mission type
- Technology
- Use
- Amateur / academic
- Program
- Chosun
- Owner
- Chosun U
- Country
- South Korea
- Builder
- Chosun University
- Platform (bus)
- Cubesat 6U
Launch
- Date
- June 21, 2022 · 07:00 UTC
- Launch record
- 2022-065Success
- Rocket
- Nuri
- Spaceport
- Naro · pad LC2
Orbit and fate
- Orbit class (GCAT)
- LEO/S
- Perigee
- 693 km
- Apogee
- 704 km
- Inclination
- 98.02°
- Status
- In orbit
- Last known active
- Jul 1, 2022
- End of operations
- Jul 1, 2022
Size
- Mass
- 10 kg
- Dry mass
- 10 kg
- Length
- 0.3 m
- Diameter
- 0.20 m
- Span
- 0.3 m
Source: GCAT payload, deep-space and lander catalogs, Jonathan C. McDowell (CC BY 4.0); Wikidata Q140615630 (CC0).